Friday, March 2, 2007
Ribbit Ribbit
More frogging. Having taken the whole sweater apart and re-knit it through the first section of cabling (with the correct instructions this time) I discovered that I had yet again messed up the cables (my error). Ugh. So I ripped out five rows, rather than the whole thing, and I must say that ripping out rows and picking up live stitches again was much less scary than I had feared. So now I'm back at the beginning of the cables, and as god is my witness, this time I'm getting them right.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment